CRAWFORD ISD
|
|
|||||||||||||
|
|||||||||||
|
|||||||||||||||||||||||||||||||||||
|
|||||
|
|||||||||||||||
Technology Planning Committee
|
|||
Existing Conditions:
Network Configuration:
T1 Line
ISP:Texas State Technical College
Local Firewall/Internet Filter
installed
Router connected to (3) Switches in Main Server Closet
High
School wing via fiber (2) switches to rooms
Middle School Library via fiber
(3) switches to rooms
Elementary School via fiber (3) switches to rooms
Wireless connections: High School Library, High School foyer, Elementary
Library
Servers:
Websense (Internet and content filter)
Pirate-DC (Fileserver, DHCP, DNS)
Pirate-Library (Fileserver)
Appleshare (Fileserver and printing)
Veritas Tape Drive Backup
System/Server
Network description: The district-wide LAN connects
the three Crawford ISD campuses. Ethernet switches are connected by fiber-optic
backbones which run between the separate buildings. Classroom connections run at
a speed of 100-MBit/sec, while the backplane of the interconnected switches run
at a full 1-Gbit/sec. Servers have been updated annually. Filtering software has
been installed to comply with federal legislation. There are three wireless base
stations.
Workstations: Each classroom has network/Internet connectivity
through at least two 100Base-T Ethernet drops (the new elementary school has
four drops per classroom). Every teacher has a new Dell computer purchased in
September 2005. All elementary classrooms have two student workstations. Middle
school reading classrooms have a student workstation. The libraries, the three
special education classrooms, and the debate classroom have student
workstations.
Labs: The high school has three computer labs. Two of the
labs are used entirely for scheduled classes. Classes offered include Desktop
Publishing, Web Mastery and Multimedia in addition to the standard classes. The
PC lab was upgraded with new Dell computers during the 2003-2004 school year.
The computers in the Macintosh lab were replaced with new Dell computers in
December 2004. In addition, the high school has a third computer lab, the Open
Lab, which is equipped with a dozen new Dell computers purchased in September
2005 and iMacs, which were replaced in September 2006 with a dozen new Dell
computers. Teachers can schedule time in the Open Lab for class projects such as
electronic field trips, research, creative writing, and test practice. The new
middle school lab was completed in January 2005 and furnished with new Dell
computers. Teachers can schedule time in this lab for Internet projects,
research, word processing, and test practice. The elementary school has a
computer lab which was upgraded during summer 2006 with Dell computers donated
to the school. Each class has a scheduled computer time. In addition teachers
can schedule additional computer time for class projects. All five labs have
full Internet and network connectivity.
Libraries: The three libraries
are fully automated (Follett) and have a minimum of four student workstations
per library with full Internet/network access.
Distance Learning: After
participating in a TIE-Grant with the Region 12 Service Center and other school
districts, Crawford ISD received video-conferencing equipment to be used for
distance learning classes. The success of our dual credit high school classes
with McLennan Community College led the district to upgrade its system with new
video-conferencing equipment during the 2003-2004 school year. A distance
learning class is offered each semester depending on student needs.
Technical Personnel
Technology Director: The Technology Director
facilitates the integration of technology with academics throughout the Crawford
school district. The position was created to implement the goals of the first
TIF grant (RFP2) received by the school. However, the scope of the job extends
beyond the focused goals of the initial grant. The director implements the
installation and configuration of new systems, both hardware and software. This
includes classroom and lab workstations, file servers, printers, network
hardware, operating systems, and Internet connections. In the event that
services are contracted to outside providers, the Technology Director oversees
the project through completion. The Technology Director trains faculty using a
"train the trainer" model and conducts all staff development. Ongoing
responsibilities include troubleshooting and maintenance of systems, the
planning, recommendation, and selection of equipment for future technology
needs, and serving on the Technology Committee.
District
Librarian/Technology Plan and E-Rate Coordinator: As the Project Director for
TIF RFP#2 and PS8 grants, this position is responsible for overseeing many
aspects of technology implementation. Duties include training teachers and
students in the use of the Internet and electronic resources, working with the
technology director, selecting and ordering hardware and software, and all
aspects of E-Rate. Responsibilities also include overseeing the library's
automation system and instructing all users. The librarian is also responsible
for the development and implementation of the outreach program designed to
extend the school's technology resources into the community and serves on both
the Technology Comittee and the Technology Task Force.
Technology/Computer Aide: This position on the elementary campus is
responsible for preparing and teaching basic computer skills that address the
Texas Essential Knowledge and Skills for Technology Applications (Chaper 126,
Subchapter A. Elementary). In addition, the computer aide collaborates with
teachers on technology projects and troubleshoots technical problems for the
technology director. The aide also works with the technology director and the
district librarian to address the technology needs of teachers, students, and
parents.
STAFF DEVELOPMENT
The ultimate goal of staff
development is to insure that teachers are properly prepared to make technology
and the Internet cornerstones of their classroom instruction. Through a series
of local workshops during the summer and staff development throughout the school
year, Crawford ISD faculty has the opportunity to develop their technology
skills to their fullest potential.
Instruction will continue to be
provided on Internet/curriculum integration, the development of multimedia
projects, web page construction, word processing, databases, spreadsheets,
electronic grade book, e-mail, and specific software programs. Instruction is
geared to the various skill levels found within the faculty. Just-in-time and
individual instruction are also provided. A minimum of six workshops is offered
each summer. Throughout the school year, staff development focusing on various
aspects of technology integration is provided. Teachers have the opportunity for
release time to attend workshops at Region 12 and to visit their peers at
schools where technology is being employed successfully. Teachers may also
receive training at McLennan Community College, Texas State Technical College,
and online via the Internet or distance learning. Teachers must attend three
approved technology workshops during the summer.
Technology Needs:
Through ongoing needs assessment, the completion
of Texas Teacher STaR Charts and technology surveys, and the evaluation process
detailed in the Evaluation section of this plan, the following technology needs
and issues have been identified.
Technology Needs:
1. Complete
infrastructure upgrades with the purchase of a server and additional switches,
routers, and wireless access points.
2. Purchase new PCs for the High
School teaching lab (PC Lab1). Replace the computers in the elementary lab with
the computers from PC Lab1 (purchased in January 2004). Use the Dell computers
currently in the elementary lab to replace remaining iMacs.
3. Purchase
new student workstations for the three libraries.
4. Purchase wireless
mobile labs for the elementary campus.
5. Complete the transition from a
dual platform District on all three campuses to a PC environment throughout the
District.
6. Purchase additional digital cameras, InFocus projectors,
scanners, and video equipment for each campus. Provide the necessary staff
development and workshops to train teachers on the use of this equipment to
produce multimedia projects with their students.
7. Update and refine
the district's Acceptable Use Policy yearly and more often if the need arises.
8. Assign specific responsibilities to various district personnel for
maintaining and updating the District web site. Assist teachers in the
development of their class websites.
9. Increase technology offerings to
students.
10. Expand and develop professional development offerings
throughout the school year.
Technology Issues:
1. Find ways to
increase student access to technology at all levels.
2. Find new and
creative ways to help teachers integrate technology into the curriculum.
Teachers have so many demands on their time that technology personnel must find
ways to help all teachers, from the technology savvy to the novices, integrate
technology across the curriculum.
3. Continue to investigate new avenues
of funding to update and expand the infrastructure including new and emerging
technologies. There are a number of computers that need to be replaced or
updated. Until that is completed a larger share of the budget needs to be spent
on infrastructure. When that projects is completed, a larger share of the budget
can be spent on staff development and the area of teaching and learning.
4. Student safety on the Internet both at school and at home is an
ongoing issue. In addition to Internet content filtering, continue to refine
methods to increase student safety on the Internet at school. In addition,
periodically remind/alert parents to the very real dangers that their children
may encounter at home on the Internet.
| GOAL 1: Teaching and Learning--Students will use technology as a tool in all academic areas to improve student achievement. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.1.1: | Vertically align Technology Application TEKS and implement
benchmark assessments for K-2, 3-5, and 6-8.
Comments: The District has updated the vertical alignment of the curriculum. This will be reviewed as necessary. LEA LRPT Correlates: EP01, TL01, TL03 |
State: Revised
Status: In Progress |
Ongoing | Technology Teachers & Aides, District Librarian, Campus Principals, Classroom Teachers | Curriculum Documents, Student Assessment Results | ||||
| 1.1.2: | Provide students with integrated subject lessons.
Comments: Technology integration will occur in all grades levels across the curriculum. LEA LRPT Correlates: TL01, TL03, TL09, TL13 |
State: Original
Status: In Progress |
Ongoing | Classroom Teachers, Technology Teachers & Aides, District Librarian | Lesson Plans, Technology Logs | ||||
| 1.1.3: | Students will be proficient at using the electronic
resources available through the library using the Texas School Library
Standards as the tool for measuring student success.
Comments: Crawford ISD supports the guidelines established by 2004 School Library Programs: Standards and Guidelines for Texas. LEA LRPT Correlates: TL11 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Library Aides | Library Logs, Student Projects | ||||
| 1.1.4: | Analyze student use of technology correlated to academic
success in subject areas.
Comments: Development of the Analytic Rubric will begin during the May 2007 staff development. The areas to be analyzed will include subject area technology use, Accelerated Reader/STAR data, SLEEK, and MathsFacts in a Flash. This strategy will become ongoing after implementation. LEA LRPT Correlates: TL04, TL05 |
State: Revised
Status: Planned |
2006-07 School Year | Technology Committee, Classroom Teachers, Campus Planning
Committees |
Completed Analytic Rubric | ||||
| 1.1.5: | All students will have access to the Internet to engage in
age appropriate learning activities including electronic field trips,
webquests, and conducting research.
Comments: To teach research skills the Big Six and the Super Three models will be used with students in grades K-8. LEA LRPT Correlates: I05, TL09, TL13 |
State: Revised
Status: In Progress |
Ongoing | Technology Teachers & Aides, Classroom Teachers, District Librarian | Technology Logs, Lesson Plans, Student Projects | ||||
| 1.1.6: | Continue to purchase necessary licenses for software and
access licenses for online databases and other electronic resource
materials.
Comments: A site license for Contribute has been purchased so that all teachers can create a webpage on the district website. LEA LRPT Correlates: LAS02, TL10, TL16 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Technology Teachers & Aides, District Librarian | Purchase Orders, Programs Installed | ||||
| 1.1.7: | Use the Technology Application TEKS, the Texas School
Library Standards, and the Texas STaR Chart as measurement tools for
evaluating the technology proficiencies of students and teachers and for
establishing expectations for the successful use of technology by teachers
and students.
Comments: As part of the vertical alignment of the curriculum, evaluation tools for assessing the Technology Application TEKS benchmarks will be developed. LEA LRPT Correlates: EP05, EP06, LAS03, TL01, TL06, TL07 |
State: Revised
Status: In Progress |
Yearly Evaluations | District Librarian, Classroom Teachers, Technology Teachers and Aides, Technology Director | STaR Chart Data, Self-Assessment Evaluations | ||||
| 1.1.8: | To increase students' technology proficiency and desire to
use technology, week-long summer technology camps will be offered to
elementary and middle school students.
Comments: In addition to providing fun and exciting uses of technology and the Internet, the camps will provide instruction in word processing and graphics. LEA LRPT Correlates: LAS15, TL12, TL13 |
State: Revised
Status: Planned |
Summer 2007 | Elementary Principal, District Librarian, Technology Aide | Summer Enrollment | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.2.1: | Technology integration throughout the curriculum at all
grade levels will be part of each campus plan.
LEA LRPT Correlates: EP01, LAS01, LAS02, LAS03, TL01, TL03, TL06 |
State: Original
Status: In Progress |
Ongoing | Campus Planning Committees, Technology Committee, District Librarian | Campus Plans | ||||
| 1.2.2: | All classroom teachers will be required to complete a
minimum of one technology project with their students each semester.
Comments: This technology requirement was implemented during the years the District had TIF grants. In August 2004, this became a mandatory, ongoing requirement. LEA LRPT Correlates: TL01, TL06, TL09, TL13 |
State: Revised
Status: In Progress |
Ongoing |
Classroom Teachers, Campus Principals | Lesson Plans, Technology Logs, Student Projects
| ||||
| 1.2.3: | Videostreaming will be used throughout the district.
Comments: Videostreaming has been expanded throughout the District. Videostreaming services are secured through Region 12. Workshops including videostreaming are offered each summer. LEA LRPT Correlates: EP01, EP08, LAS03, TL13 |
State: Revised
Status: In Progress |
Ongoing | Technology Teachers and Aides, Technology Director, Classroom Teachers | Purchase Order, Technology Logs, Lesson Plans | ||||
| 1.2.4: | Teachers will use the Internet to supplement classroom
instruction where textbooks have failed to keep up with developments on a
topic, where knowledge has become increasingly specialized, or is very
current.
LEA LRPT Correlates: I05, TL13 |
State: Original
Status: In Progress |
Ongoing | Classroom Teachers |
Lesson Plans, Technology Logs | ||||
| 1.2.5: | Continue and expand the use of distance learning
opportunities for students including dual credit courses with McLennan
Community College.
LEA LRPT Correlates: LAS15, TL13 |
State: Original
Status: In Progress |
Ongoing | Technology Teachers, Guidance Counselor | Classes Taught | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.3.1: | All students, grades 1-12, will use the Accelerated Reader
program developed by Renaissance Learning.
Comments: Teachers use the progress reports available in the management program to access student progress and to diagnose student weaknesses. The principals established in Reading Renaissance are used to help all students improve their reading skills. Elementary parents and guardians receive weekly progress reports and a Student Reading Record every six weeks. Middle school and high school students receive a report after each test taken. This program will continue to be used in the future. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Library Aides, Classroom Teachers | Student Reading Records, Student Progress Reports | ||||
| 1.3.2: | All students in grades 1-8 take the STAR Reading Test
developed by Renaissance Learning.
Comments: Student reading progress is analyzed using the reports and analysis tools available in the STAR program. STaR test results are used to help establish student Accelerated Reader goals. STAR results are sent to parents and guardians using the parent report generated by the management program. In future school years, this strategy will continue to be employed every semester on an updated schedule. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Technology Aide, Library Aides, Classroom Teachers | STAR Test Results/Summaries | ||||
| 1.3.3: | All middle school students will use MathFacts in a Flash
developed by Renaissance Learning.
Comments: Student achievement will be accessed using the teacher reports available with MathFacts. Middle School will purchase Accelerated Math and STAR Math as soon as funding is secured. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Revised
Status: In Progress |
Ongoing | Middle School Principal and Math Teachers | Technology Logs, Lesson Plans | ||||
| 1.3.4: | Middle school and high school students will use Sleek
Software in preparation for the TAKS tests.
Comments: Sleek software was upgraded and expanded this year to include reading, writing, math, social studies, and science for students in grades 5-11. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Original
Status: In Progress |
Ongoing | Technology Director, Classroom Teachers | Programs in use. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.4.1: | Install additional student workstations in classrooms.
Comments: The District is in the process of moving from a dual platform environment to a PC environment. Teacher, student, and lab computers will be replaced/upgraded over the next several years. LEA LRPT Correlates: I01, I04, I07, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Technology Aide, Classroom Teachers
|
Computers Installed | ||||
| 1.4.2: | Provide a portable lab for each campus that can be used in
the classrooms.
Comments: Portable labs were purchased for high school and middle school this semester and are in use. A mobile lab will be purchased for elementary during the 2007-2008 school year. LEA LRPT Correlates: I01, I04, I05, I09, LAS15, TL09, TL13 |
State: Revised
Status: In Progress |
2007-High School, 2007-Middle School, 2007-2008-Elementary | Technology Director, Technology Aides, District Librarian | Purchase Orders | ||||
| 1.4.3: | Provide expanded student access to lab and library
computers.
Comments: The District will maintain flexible scheduling in all libraries and continue to provide a lab on each campus that can be utilized by all grade levels and subject areas for technology projects and Internet use. LEA LRPT Correlates: EP08, I01, I05, I09, TL08, TL09, TL10, TL11, TL13 |
State: Original
Status: In Progress |
Ongoing | District Librarian, Library Aides, Technology Teachers
& Aides, Classroom Teachers |
Technology Logs, Electronic Statistics | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.5.1: | Continue to provide dual credit distance learning classes
through McLennan Community College and investigate other distance learning
opportunities for students.
LEA LRPT Correlates: I09, LAS15, TL13 |
State: Original
Status: In Progress |
Ongoing | Guidance Counselor, Principals | Classes Offered, Technology Logs | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.6.1: | All Crawford ISD libraries will participate in the
comprehensive state technology system and in regional technology
cooperatives.
Comments: Crawford High School Library was one of the first libraries to join the Texas Library Connection, TLC. The Elementary Library joined later. The services provided through TLC were excellent. We hope that funding for this vital program is restored. Crawford ISD Libraries will apply to join any new statewide technology systems that are developed. CISD does participate in cooperative technology agreements with Education Service Centers in Texas. LEA LRPT Correlates: EP06, I06, LAS13, TL10, TL11 |
State: Revised
Status: In Progress |
Ongoing | District Librarian | Applications Submitted | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 1.7.1: | Teachers, the district librarian, and the technology aide
will review the Acceptable Use Policy with students. The District
Librarian will review the policy with parents and community members and
keep signed agreements for all users on file.
Comments: Student safety on the Internet is of crucial concern. LEA LRPT Correlates: TL14 |
State: Revised
Status: In Progress |
First Day of School, Ongoing |
Classroom Teachers, District Librarian, Technology Aide | Signed Agreements, Technology Logs | ||||
| GOAL 2: Educator Preparation and Development--Increase all teachers' ability to integrate technology into all the curriculum areas and in the process transform classroom practices to promote student-centered learning. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.1.1: | Continue to offer workshops that focus on preparing
teachers to integrate technology and the Technology Applications into
their subject areas/grade levels.
Comments: Technology workshops are offered at Crawford ISD every summer. All teachers are required to complete three technology workshops each summer. Teachers may select workshops from Crawford ISD, Region 12, MCC, TSTC, or another approved provider. Title II, Part D funds will be used to support the costs of summer workshops and staff development provided by Crawford ISD. LEA LRPT Correlates: EP01, EP02, EP04, EP06, TL01, TL02 |
State: Revised
Status: In Progress |
Each Summer | Technology Director | Workshop Schedule, Workshop Evaluations | ||||
| 2.1.2: | Continue to provide workshops on specific programs, such as
Microsoft Office Suite of Programs and Contribute, and their use in the
production of multimedia projects.
Comments: Tech Prep funds will be used along with local funds to insure that adequate licenses for needed programs are purchased and updated. LEA LRPT Correlates: EP01, EP02, EP04, LAS03 |
State: Revised
Status: In Progress |
Summer Workshops, Ongoing | Technology Director | Workshop Schedules, Workshop Evaluations, Technology Logs | ||||
| 2.1.3: | Continue to provide workshops on the use of digital
cameras, scanners, and video equipment and their use to produce multimedia
projects.
Comments: In addition to the workshops offered every summer, just-in-time training will also be provided on an ongoing basis. LEA LRPT Correlates: EP01, EP02, EP03, EP04 |
State: Revised
Status: In Progress |
Summer Workshops, Ongoing | Technology Director | Workshop Schedule, Workshop Evaluations | ||||
| 2.1.4: | Continue to provide workshops on the effective use of the
Internet in teaching with emphasis on student safety.
Comments: Internet/curriculum integration workshops are offered at Crawford ISD every summer. LEA LRPT Correlates: EP01, EP02, EP04, TL14 |
State: Revised
Status: In Progress |
Summer Workshops, Ongoing | Technology Director, Librarian | Workshop Schedules, Workshop Evaluations | ||||
| 2.1.5: | Continue to offer just-in-time training to classroom
teachers so they can complete technology integration requirements and work
effectively to integrate technology.
LEA LRPT Correlates: EP01, EP09 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Library Aides, Technology Teachers and Aides, Technology Director, Teacher Mentors | Technology Logs | ||||
| 2.1.6: | Provide teachers with instruction on the use of the
library's electronic resources with emphasis on collaboration and flexible
scheduling that will lead to increased student access.
Comments: Special emphasis will be placed on SIRS and Digital Knowledge Central resources. Just-in-time training is offered throughout the school year. LEA LRPT Correlates: EP01, EP08, TL11 |
State: Revised
Status: In Progress |
Yearly Staff Development, Ongoing | District Librarian, Library Aides, Technology Director | Workshop Schedules, Technology Logs | ||||
| 2.1.7: | Correlate workshop offerings and staff development to cover
SBEC Technology Applications and Standards.
Comments: Workshops and staff development address the various skill levels of the faculty and aides. LEA LRPT Correlates: EP01, EP02, EP04, EP05, TL01 |
State: Revised
Status: In Progress |
Summer Workshops, Staff Development | Technology Director | Technology Rubrics, Technology Skills Checklists, STaR Chart | ||||
| 2.1.8: | Distance learning and the Internet will be utilized to
bring advanced technology integration to all teachers and staff.
Comments: As teachers technology skills develop, they will be encouraged to participate in the Master Technology Teacher program. Mentor teachers who have advanced technology skills will be able to assist other teachers. LEA LRPT Correlates: EP01, EP02, EP04, EP06, EP07, EP09, LAS10 |
State: Revised
Status: In Progress |
Summer Workshops, Staff Development, Ongoing | Campus Principals, Guidance Counselor, District Librarian, Technology Director | Workshop Schedule, Technology Logs | ||||
| 2.1.9: | Include technology integration in the evaluations of
teachers and librarians.
Comments: Evidence of technology integration by teachers can be demonstrated through lesson plans, teacher portfolios, and sample student projects. This strategy will become ongoing after implementation. LEA LRPT Correlates: EP05, LAS12, TL06 |
State: Revised
Status: In Progress |
Yearly Evaluation Schedule | Campus Planning Committee, Campus Principals | Teacher/Librarian Evaluations | ||||
| 2.1.10: | Staff development will continue to be an integral component
of technology planning.
LEA LRPT Correlates: EP06, EP07, LAS01, LAS02, LAS03 |
State: Revised
Status: In Progress |
Ongoing | Technology Committee, Campus Planning Committees | Campus Plans, Technology Budgets, Workshop Schedules, Staff Development Agendas | ||||
| 2.1.11: | Encourage the involvement of local businesses and community
members in collaborative technology projects with students and teachers.
LEA LRPT Correlates: I03, LAS07, LAS09, LAS13, TL12 |
State: Revised
Status: Planned |
2007-08 School Year | Superintendent, Campus Principals |
Technology Logs | ||||
| 2.1.12: | Provide the necessary software/programs and supplies for
teachers and students to produce finished products.
Comments: Supplies would include such items as appropriate paper, colored ink and toner cartridges. LEA LRPT Correlates: I05, LAS02, TL09 |
State: Revised
Status: In Progress |
Ongoing | Superintendent, Technology Director, District Librarian | Purchase Orders, Supplies | ||||
| 2.1.13: | All teachers will complete a self-evaluation of their
technology skills using a technology checklist.
Comments: Results will be evaluated to plan future staff development tailored to faculty needs; the checklists will also be used to help teachers complete their yearly STaR Charts. This strategy will become ongoing after implementation and will be done on an annual basis. LEA LRPT Correlates: EP05, TL06 |
State: Revised
Status: Planned |
August 2007 | Technology Director, District Librarian | Completed Checklists, Staff Development Agenda | ||||
| 2.1.14: | Plan for staff development as part of the yearly District
budget planning process allocating appropriate funding for staff
development and workshops.
LEA LRPT Correlates: EP01, EP02, EP03, LAS01, LAS02 |
State: Original
Status: Planned |
Yearly (February through April) | Superintendent, Technology Director, Technology Committee | Budget, Committee Reports | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.2.1: | Provide release time for teachers to work with peers and
library staff so they can plan collaborative projects for their students
or to attend technology workshops.
Comments: Technology allotment funds will be used to provide substitutes for classroom teachers requesting release time for technology professional development and collaboration. LEA LRPT Correlates: EP06, EP07, LAS02, LAS06, LAS13, TL11 |
State: Revised
Status: In Progress |
Ongoing | Campus Principals, Classroom Teachers, District Librarian | Release-Time Evaluations, Student Projects | ||||
| 2.2.2: | All teachers will provide their students with a minimum of
one collaborative opportunity involving technology. Teachers will be
encouraged to provide multiple collaborative opportunities for students
and to include opportunities for their students to work with classes, the
community, and experts around the world via the Internet.
Comments: Sample student projects will be a part of each teacher's technology portfolio. LEA LRPT Correlates: I03, LAS07, LAS09, LAS13, TL15 |
State: Revised
Status: In Progress |
Ongoing | Campus Principals, Classroom Teachers |
Lesson Plans, Student Projects, Technology Logs | ||||
| 2.2.3: | Involve local businesses and community members in
collaborative learning with teachers and students.
Comments: This strategy will become ongoing after implementation. LEA LRPT Correlates: I02, I03, LAS13 |
State: Revised
Status: Planned |
2007-08 School Year | Superintendent, Campus Principals |
Technology Logs, Student Projects | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.3.1: | All teachers will develop a portfolio of web sites,
software programs, and electronic databases that they use to integrate
technology.
Comments: Portfolios may be hard copy or electronic. They will be used to assist principals in teacher evaluations and to assist teachers as they complete their yearly STaR Charts. LEA LRPT Correlates: EP05, LAS12 |
State: Revised
Status: In Progress |
Ongoing |
District Librarian, Campus Principals, Technology &
Classroom Teachers |
Portfolios | ||||
| 2.3.2: | An electronic portfolio of exemplary uses of technology in
education (best practices) will be developed and shared on the District's
LAN and web site.
LEA LRPT Correlates: EP08 |
State: Revised
Status: In Progress |
March 2006, Ongoing | Technology Director, Technology Teachers and Aides,
District Librarian |
Portfolio on Pirate-DC Server, District Web Site Links | ||||
| 2.3.3: | Maintain a faculty share point on the network where faculty
members can access files from the administration, the technology director,
the librarian, and from each other.
LEA LRPT Correlates: I01, LAS13, TL06 |
State: Original
Status: Completed |
Ongoing | Technology Director | Network Share Point | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 2.4.1: | Provide staff development and just-in-time training to help
teachers analyze the effectiveness of their use of technology with their
students.
LEA LRPT Correlates: EP03, EP08, LAS10, TL04, TL05, TL06 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Technology Director, Technology Teachers | Staff Development Agendas, Technology Logs | ||||
| 2.4.2: | Provide staff development and just-in-time training for the
analysis of the data generated by the Accelerated Reader Program, the STAR
Reading Test, MathFacts in a Flash, and Sleek Software to analyze and to
improve student progress.
LEA LRPT Correlates: EP03, TL07 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Technology Director | Student Records, Staff Development Agendas, Technology Logs
| ||||
| GOAL 3: Administrative and Support Services--Use technology to facilitate data-driven decision making and to improve communication within the school community and throughout the Crawford community. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.1.1: | All campuses will use the electronic grade book system to
maintain student grades and generate reports for student, parent, and
administrative use.
Comments: Staff development will be offered during the summer and during school. LEA LRPT Correlates: EP03, LAS08, TL04 |
State: Revised
Status: Completed |
Ongoing | Campus Principals, Technology Director, Classroom Teachers | Use of Electronic Gradebooks | ||||
| 3.1.2: | Teachers will continue to use the reports generated by the
Accelerated Reader Program and the STAR Reading Comprehension Test to
monitor and analyze student reading progress, using the results to modify
reading levels and ranges to enhance student achievement.
Comments: Staff development will continue to include the use of appropriate reports to keep parents and guardians informed of student progress. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Classroom Teachers | Student Reading Logs, Accelerated Reader Reports
| ||||
| 3.1.3: | Teachers will analyze reports generated by the Sleek
Software to help identify student strengths and weaknesses in reading,
writing, math, social studies, and science.
Comments: After analysis the Sleek programs will be used to develop students' skills and expand their knowledge base. LEA LRPT Correlates: EP03, LAS08, TL04, TL05, TL07 |
State: Original
Status: In Progress |
Ongoing | Classroom Teachers, Technology Director | Student Progress Reports | ||||
| 3.1.4: | All teachers will continue to be encouraged to use
electronic lesson plan books.
Comments: Elementary teachers submit electronic lesson plans. Eventually, the entire District will submit lesson plans electronically. LEA LRPT Correlates: LAS10 |
State: Revised
Status: In Progress |
Ongoing | Campus Principals | Lesson Plan Format | ||||
| 3.1.5: | Technology will be a cornerstone of all classroom, library,
campus and district plans.
LEA LRPT Correlates: LAS01, LAS02, LAS03, TL11 |
State: Revised
Status: In Progress |
Ongoing | Campus Committees, Technology Committee | Campus Plans, District Plans, Technology Plan | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.2.1: | All staff will utilize electronic means to communicate
student progress, including the use of e-mail and the District Web Site.
Teachers will create their own school web pages.
Comments: Teachers will use Contribute to create their own school web pages. LEA LRPT Correlates: TL16 |
State: Revised
Status: In Progress |
Ongoing |
Campus Principals, Technology Director | Technology Logs | ||||
| 3.2.2: | Teachers will use electronically analyzed student data to
inform parents of student progress wherever possible.
LEA LRPT Correlates: I01, I08, LAS08, LAS09, LAS11, TL15, TL16 |
State: Revised
Status: In Progress |
Ongoing | Campus Principals, Technology Director, District Librarian, Classroom Teachers | Student Data, Technology Logs | ||||
| 3.2.3: | The Crawford ISD Web Site will be maintained and updated
with information for teachers, students, parents, and the community
including information pertaining to adult literacy.
Comments: The Web Mastery class is currently working on updating and redesigning the District web site. LEA LRPT Correlates: I08, LAS09, TL15, TL16 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Technology Teachers, Campus Principals, District Librarian | Web Site Updates | ||||
| 3.2.4: | The Technology Committee will evaluate the Crawford ISD
Technology Plan annually.
Comments: The Technology Plan is reviewed and revised annually on a schedule set to coincide with yearly E-Rate applications and e-Plan submission dates. The most recent review and revisions occurred in February/March 2007. LEA LRPT Correlates: LAS01, LAS02, LAS04, LAS05, TL11 |
State: Revised
Status: In Progress |
Annually | Technology Committee | Technology e-Plan Submission, Technology Rubric | ||||
| 3.2.5: | The district librarian, technology staff, and teachers will
be encouraged to write grants and seek partnerships expanding the use of
technology in the curriculum, incorporating emerging technologies, and
expanding the District's infrastructure.
Comments: Crawford ISD has been selected by KWBU, Waco to participate in a TEA grant (Instant Video Library: Chalkwaves). Crawford received donated Pentium 4 computers from the Texas Legislative Council. A Tech Prep grant is currently in the review process. See also, Strategy 4.1.6 LEA LRPT Correlates: I02, I03, LAS07, LAS13, LAS14 |
State: Revised
Status: In Progress |
Ongoing | Technology Committee | Staff Development Agendas, Grants Submitted | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.3.1: | All district libraries will continue to utilize the Follett
automation system.
LEA LRPT Correlates: TL10 |
State: Original
Status: In Progress |
Ongoing | District Librarian | Follett Support Agreements | ||||
| 3.3.2: | All District personnel will utilize network resources
(including software packages or the Internet as appropriate) to analyze
student data, to facilitate sharing information, and to insure data driven
decision making.
LEA LRPT Correlates: LAS08, TL04, TL05, TL06, TL07 |
State: Original
Status: In Progress |
Ongoing | Campus Principals, Technology Director, District Librarian | Technology Logs, Student Data, Reports | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.4.1: | Extend teacher and student access to school network
resources (including the library) and to their individual files from home
or from other remote computers.
Comments: Remote access of selected electronic resources is currently in place. LEA LRPT Correlates: I01, I03, TL15 |
State: Revised
Status: In Progress |
Faculty--2007, Students--2008, Ongoing |
Technology Director | User Account Logs | ||||
| 3.4.2: | Encourage the use of school network resources, including
the use of the district's libraries, by the community through
announcements on the district web site, Connect-Ed, PTO newsletter, and
the community newspaper.
Comments: Connect-ED is a program designed for community outreach to within minutes to send messages to parents, community members, students, or specific groups via e-mail or telephone. This program was initiated in February 2007. LEA LRPT Correlates: I03, I08, LAS09, TL15 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Technology Director | Uploaded and Published Notices | ||||
| 3.4.3: | Continue to provide just-in-time training to members of the
community on the use of the school's electronic resources.
LEA LRPT Correlates: LAS09 |
State: Original
Status: In Progress |
Ongoing | District Librarian, Technology Director and Aide,Library Aides | Technology Logs | ||||
| 3.4.4: | Allow parental and community access to personnel and other
non-secured data via the District's Web Site.
LEA LRPT Correlates: I08, LAS11 |
State: Revised
Status: In Progress |
2007, Ongoing | Technology Director | Web Site Links | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.5.1: | Provide links on the District Web Site to adult literacy
information, programs, and opportunities at the Waco McLennan County
Library and at McLennan Community College.
LEA LRPT Correlates: I08, TL15 |
State: Revised
Status: In Progress |
Ongoing | District Librarian, Technology Director | District Web Site Links | ||||
| 3.5.2: | Provide a link on the District Web Site directing people to
the district librarian for assistance in locating adult literacy services.
LEA LRPT Correlates: I08, TL15 |
State: Revised
Status: Completed |
Ongoing | District Librarian, Technology Director | District Web Site Link | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 3.6.1: | Use distance learning and online resources to provide
parents and community members with access to educational programs and
opportunities for students and adults.
LEA LRPT Correlates: I03, TL13, TL15 |
State: Revised
Status: In Progress |
Ongoing | Guidance Counselor, Technology Director, District Librarian | Technology Logs | ||||
| 3.6.2: | Provide links on the District Web Site to bring information
about best technology practices to parents and the community.
LEA LRPT Correlates: I08, TL15 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, District Librarian, Technology Teachers | Active Links | ||||
| GOAL 4: Infrastructure for Technology--Maintain and increase the capabilities of the district's LAN, Internet connectivity, user/computer ratio, and incorporate technology in all areas. | |||||||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.1.1: | Evaluate and upgrade servers as needed.
Comments: A new media server was added to the network in March 2006 as part of a TEA grant. See Strategy 4.1.6 LEA LRPT Correlates: I01, I07 |
State: Revised
Status: In Progress |
Ongoing | Technology Director | Purchase Orders, Servers Installed | ||||
| 4.1.2: | Add routers, switches, and hubs as needed.
LEA LRPT Correlates: I01, I07, I08 |
State: Revised
Status: In Progress |
Ongoing | Technology Director | Purchase Orders, Equipment Installed | ||||
| 4.1.3: | Upgrade computer labs with new computers.
Comments: Twelve Dells were purchased in September 2006 to complete the Open Lab in high school. The elementary lab was upgraded in Spring 2006. Two mobile labs were purchased in March 2007. Computer labs will be replaced on a rotating schedule with replaced computers being assigned to other locations. LEA LRPT Correlates: I01, I04, I05, I07, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Campus Principals | Labs Installed | ||||
| 4.1.4: | Upgrade computers in all campus libraries including
circulation stations and student workstations.
Comments: Student workstations were installed in the libraries during Summer 2006. LEA LRPT Correlates: I07, TL10 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, District Librarian |
Installed Workstations | ||||
| 4.1.5: | Add additional wireless points of entry to the network.
LEA LRPT Correlates: I01, I05, I07, TL09 |
State: Revised
Status: Planned |
Ongoing | Technology Director | Base Stations Installed, Technology Logs | ||||
| 4.1.6: | Pursue grant/outside funding sources to enhance and expand
the infrastructure.
Comments: Crawford ISD has been selected by KWBU, Waco to participate in a TEA grant (Instant Video Library: Chalkwaves). Crawford will also received donated Pentium 4 computers from the Texas Legislative Council. A Tech Prep grant is currently in the review process. See also, Strategy 3.2.5. LEA LRPT Correlates: I02, I03, LAS07, LAS13, LAS14 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Technology Committee, District Librarian | Grants/Proposals Submittted | ||||
| 4.1.7: | Replace obsolete computers and equipment as needed.
Comments: Sixty new Dell computers have been purchased during the 2006-07 school year. LEA LRPT Correlates: I04, I07, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Technology Committee | Technology Logs, Purchase Orders | ||||
| 4.1.8: | Use replaced computers in new areas or for new uses as
appropriate.
LEA LRPT Correlates: I01, I07, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, District Librarian | Technology Logs | ||||
| 4.1.9: | Add/replace printers, scanners, digital cameras, and video
equipment as necessary.
LEA LRPT Correlates: I01, I05, TL09, TL10 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, District Librarian, Technology Teachers | Technology Logs, Purchase Orders | ||||
| 4.1.10: | Purchase Palms for the elementary campus and expand their
use throughout the District.
LEA LRPT Correlates: TL08, TL09 |
State: Original
Status: Planned |
June 2007, Ongoing | Technology Director, Campus Principals | Purchase Orders, Devices in Use | ||||
| 4.1.11: | Maintain support contracts to insure data recovery of
student records, administrative files, teacher/staff files and records,
student files, and library files/records.
LEA LRPT Correlates: LAS14 |
State: Original
Status: Planned |
Ongoing | Technology Director, Superintendent, District Librarian | Contracts and support agreements in place. | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.2.1: | The district will ensure continued high-speed user access
to the Internet from network computers.
Comments: The District is in the process of adding a second T-1 lint. Installation is schedule for April 2007. LEA LRPT Correlates: I01, I06 |
State: Revised
Status: In Progress |
Ongoing | Technology Director | Internet Connectivity | ||||
| 4.2.2: | The District will maintain interactive web-based services
with Internet and Intranet components.
LEA LRPT Correlates: I01, I05, I06 |
State: Original
Status: In Progress |
Ongoing | Technology Director | Services in place | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.3.1: | The District will continue to provide each professional
with a computer and work towards a student/computer ratio of 3:1.
Comments: The district is working towards a student/computer ratio of 1:1. LEA LRPT Correlates: I04, I05, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Campus Principals | Computers in use | ||||
| 4.3.2: | All District staff have e-mail access. Student e-mail
accounts are set up as appropriate.
LEA LRPT Correlates: I05 |
State: Revised
Status: In Progress |
Ongoing | Technology Director | E-mail Accounts | ||||
| 4.3.3: | The District will strive to provide on-demand computer
access for all students.
Comments: Sixty new Dell computers were purchased during the 2006-07 school year. LEA LRPT Correlates: I04, I05, TL09 |
State: Revised
Status: In Progress |
Ongoing | Technology Director, Campus Principals, District Librarian | Computer/Student Ratios, | ||||
| 4.3.4: | The District will encourage the expanded use of distance
learning especially dual credit classes with McLennan Community Collge and
investigate online class options for students.
Comments: A Distance Learning class is offered every semester as needed. Additional Distance Learning opportunities with McLennan Community College and Texas State Technical College will be explored. LEA LRPT Correlates: EP08, LAS15, TL13 |
State: Revised
Status: In Progress |
Ongoing | Guidance Counselor, Campus Principals, Technology Director | Class Schedule, Technology Logs | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.4.1: | The District will continue to employ a district-level
technology director and elementary technology aide and investigate ways to
add additional technical support.
LEA LRPT Correlates: I01 |
State: Revised
Status: In Progress |
Ongoing | Superintendent, Campus Principals | Positions Filled | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.5.1: | The District will maintain contracts for the firewall and
Internet content filtering, regarding network security and Internet safety
as crucial responsibilities.
Comments: Services are secured through Texas State Technical College, CTEN membership. LEA LRPT Correlates: LAS05, TL14 |
State: Revised
Status: In Progress |
Ongoing | Technology Director | Contracts | ||||
| |||||||||
| Strategies | State/Status: | Timeline: | Person(s) Responsible: | Evidence: | |||||
| 4.6.1: | The Technology Committee will actively coordinate
activities funded by the Ed Tech program with other appropriate activities
and resources funded through federal, state, and local resources including
grants.
Comments: A Tech Prep grant is currently under review. As the result of a current TEA grant, Crawford is working with KWBU, Waco. LEA LRPT Correlates: I02, LAS02 |
State: Revised
Status: In Progress |
Ongoing | Technology Committee | Technology Logs, Technology Committee Reports | ||||
Method of application for formula funds: Application via a Title II, Part D shared services arrangement or cooperative
Budget year 2005 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $13,680.00 | $1600.00 Title II, Part D $12080.00 Local |
| Telecommunications & Internet Access | $8,400.00 | $3072.00 E-Rate $5328.00 Local |
| Materials & Supplies | $10,080.00 | $10080.00 Local |
| Equipment | $85,950.00 | $17933.00 Tech Allotment $68017.00 Local $.00 Local |
| Maintenance | $31,800.00 | $31800.00 Local |
| Miscellaneous Expenses | $5,100.00 | $5100.00 Local |
| Total | $155,010.00 | |
Budget year 2006 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $18,185.00 | $1000.00 Title II, Part D $17185.00 Local |
| Telecommunications & Internet Access | $15,200.00 | $5424.00 E-Rate $9776.00 Local |
| Materials & Supplies | $33,050.00 | $33050.00 Local |
| Equipment | $63,200.00 | $16664.00 Tech Allotment $46536.00 Local |
| Maintenance | $59,100.00 | $59100.00 Local |
| Miscellaneous Expenses | $4,850.00 | $4850.00 Local |
| Total | $193,585.00 | |
Budget year 2007 | ||
| Budget item | Cost | Funding Sources with amount per source |
| Staff Development | $17,960.00 | $1000.00 Title II, Part D $16960.00 Local |
| Telecommunications & Internet Access | $15,200.00 | $5424.00 E-Rate $9776.00 Local |
| Materials & Supplies | $19,740.00 | $19740.00.00 Local |
| Equipment | $42,000.00 | $16664.00 Tech Allotment $25336.00 Local |
| Maintenance | $60,000.00 | $60000.00 Local |
| Miscellaneous Expenses | $4,850.00 | $4850.00 Local |
| Total | $159,750.00 | |
Evaluation Method:
TECHNOLOGY LOGS
Technology Logs will be
used to document all aspects of technology use throughout the district. They
will be used in all classrooms, libraries, and computer labs. They will also be
used to document all technical aspects of technology including web site updates,
troubleshooting, repairs, and purchasing. Taken together they will provide
snapshots of all aspects of technology use throughout the district.
STAFF DEVELOPMENT
(1) STAFF DEVELOPMENT and WORKSHOPS:
Evaluation forms for local staff development and workshops will enable teachers
to document the quality of the instruction. Comments and suggestions by
participants will be used to plan future staff development and workshops.
Teachers will submit certificates to the campus principals for workshops and
classes taken at ESC Region 12, McLennan Communirty College, Texas State
Technical College, online,and via distance learning. These will be evaluated
using a rubric.
(2) TEACHER CONFERENCES: Technology Committee members
will meet individually with teachers. Every effort will be made to meet
individual needs. The team will use the information gathered to monitor and
adjust our activities.
(3) TEACHER PORTFOLIOS: Teachers will document
all aspects of technology use in their portfolios along with samples of student
work. During individual conferences with faculty, technology integration will be
evaluated through a rubric. The Technology Committee will use the information
gathered during the evaluation to develop plans for helping teachers integrate
technology and to develop strategies for the integration of technology into all
curriculum areas.
(4) SELF-EVALUATION CHECKLISTS: All teachers will
complete self-evaluations of their technology skills using a technology
checklist. Results will be evaluated and used to tailor staff development to the
needs of the faculty.
(5) RELEASE TIME: All teachers will thoroughly
document release days through forms to be kept in their portfolios. Teacher use
of the Internet with students will be analyzed to assess the impact of release
time.
(6) INDEPENDENT INTERNET EXPLORATION: Independent use of the
Internet by teachers in an effort to located sites and materials is a crucial
component to successful technology/curriculum integration. URLs for exemplary
sites will be distributed to teachers and posted on the Distract's LAN.
CURRICULUM/CLASSROOM INTEGRATION
(1) TEKS: TEKS taught via
technology by teachers throughout the District will be identified in teachers'
lesson plans. Descriptions of exemplary projects and best practices will be
available to all faculty members.
(2) STUDENT ACTIVITIES: Student use of
the Internet and other electronic resources will be documented through
Technology Logs kept in the computer labs and libraries. The Technology
Committee and library staff will observe student use throughout the year. The
librarian will document student use of the libraries and labs. Statistics will
be kept along with qualitative comments.
(3) COLLABORATION:
Collaboration will be evaluated through the activities and projects pursued.
Teachers will complete evaluations for all formal collaborative activities.
Informal peer collaboration will be documented in teacher portfolios and on
technology logs.
(4) EXEMPLARY TEACHER/STUDENT PROJECTS: Projects that
demonstrate exemplary uses of technology will be displayed on the network to
increase teacher and student motivation.
(5) LIBRARY USE: Technology
Logs will document teacher, class, and individual student use of the library.
(6) LESSON PLANS: Activities incorporating technology into the
curriculum will be identified in weekly lesson plans.
COMMUNICATION
AND COMMUNITY INVOLVEMENT
Technology logs will document electronic
communications to students, parents, and the community. They will also document
parent and community use of the libraries, computer labs, and electronic
resources.
COMPREHENSIVE EVALUATION
RUBRIC: At the end the year,
teachers will complete a comprehensive evaluation rubric designed by the
technology teachers, who will tabulate the results and report them to the
Technology Committee. The rubric is based on the book Evaluating Professional
Development by Thomas R. Guskey (Corwin Press).
The Texas Teacher STaR
Chart will be completed by all teachers annually. The information derived from
the STaR Charts will be used in conjunction with the results of the
comprehensive rubrics.
The Technology Committee will use the
evaluations, logs, and observations made throughout the year along with the
comprehensive rubric and STaR Chart data to review the year's technology
activities. Teachers, students, and parents will be encouraged to make
suggestions and recommendations to the committee. Changes in the technology
program and Technology Plan will be made as needed. Staff development at the
beginning and end of each school year will be the forum for initiating changes
to our procedures and activities.
ACCEPTABLE USE POLICY: Each year, the
Acceptable Use Policy will be evaluated. Student and community use will be
examined in light of the provisions in the policy. Responsible use of the
Internet will be a priority. Revisions to the policy will be made as needed.
Attachment item B:
Crawford ISD Acceptable Use Policy
http://www.crawfordisd.net/DistrictPage/Rules/AcceptableUsePolicy.pdf
CRAWFORD ISD does not discriminate on the basis of sex, disability, race, color, age, or national origin in its educational programs, activities, or employment as required by Title IX, Section 504 and Title VI.